Site-Specific Environmental Management Plan, Tanahu Hydropower (140 MW)

Seti Gandaki River, Tanahun

A construction-phase environmental management plan for the 140 MW storage hydropower dam on the Seti River, including muck disposal and river ecosystem monitoring.

Background

Tanahu Hydropower is a 140 MW storage scheme on the Seti River. Building a dam of this size produces large volumes of excavated material and puts pressure on the river during construction.

Scope

  • Site-specific environmental management plan (SEMP) for the construction phase
  • Environmental safeguard and mitigation protocols for construction activities
  • Muck disposal plans
  • Guidelines for monitoring the river ecosystem

Team

Shravan Kumar Ghimire, PhD, as team associate and environmental specialist.